The Eisenhower Matrix: what it is and how to prioritise your work

The Eisenhower Matrix helps you prioritise tasks according to their importance and urgency. Take a look at an analysis of the four quadrants, instructions on how to create the matrix, practical examples for work processes and job hunting, as well as a debunking of the myth surrounding the origin of the Eisenhower phrase.
What is in this article
Injobe
Job search platform
18 min to read
13 November 2026
Updated 16 November 2026
The Eisenhower Matrix: what it is and how to prioritise your work

In brief

  • The essence of the method: The Eisenhower Matrix sorts tasks according to two criteria — importance and urgency — into four quadrants.
  • Action rules for the quadrants:
  1. Important and urgent — do it;
  2. Important, not urgent — schedule it;
  3. Not important, urgent — delegate it;
  4. Not important, not urgent — eliminate.
  • Key focus: The most valuable quadrant is ‘important but not urgent’ (it is precisely these tasks that are usually put off first).
  • Historical fact: Dwight Eisenhower quoted the phrase ‘urgent and important’ on 19 August 1954; he did not invent it, nor did he draw the matrix himself.
  • In this article: A step-by-step guide, questions to help set priorities, a text template, an analysis of a typical working day and week spent job-hunting, and the pros and cons.

What is the Eisenhower Matrix?

The Eisenhower Matrix is a prioritisation tool. You assess each task along two axes: important or unimportant, urgent or non-urgent. There is a specific rule for each of the four combinations, so you don’t have to decide ‘what to do next’ from scratch every time, but can follow a set framework.

This is how Quote Investigator describes the method:

‘Every task is evaluated based on two axes: important/unimportant and urgent/not urgent. There are different rules for each type of task”.

The Ukrainian blog HappyMonday puts it more succinctly: the matrix helps you understand the relationship between the urgency and importance of tasks.

Other names that appear in search results and on various services: Eisenhower Matrix, Eisenhower Decision Principle, ‘Eisenhower’s box’, the ‘Urgent/Important’ matrix. In Stephen Covey’s work, the same model is called time management matrix — the time management matrix.

There are two parameters in the matrix — importance and urgency. There are four quadrants, as each parameter has only two possible answers: ‘yes’ or ‘no’. The method does not allow for intermediate assessments such as ‘somewhat important’, and therein lies its strength: it forces you to make a clear decision.

Why is it needed: the mere urgency effect

The main purpose of the matrix is to prevent urgent tasks from crowding out important ones. This is not a metaphor, but a scientifically documented effect. In 2018, the Journal of Consumer Research published an article by Zhu, Yang and Hsee entitled ‘The Mere Urgency Effect’ (vol. 45, pp. 673–690).

The authors conducted five experiments. The result: people are more likely to tackle unimportant tasks with objectively lower benefits if they merely appear urgent. The researchers call this ‘the mere urgency effect’ (mere urgency effect).

The same article makes a working distinction between two concepts:

  • Urgent tasks are those with a short time window for completion.

  • Important tasks are those with greater consequences.

Hence the practical conclusion: the feeling that ‘it must be done now’ does not necessarily mean that the task is worth your time. The matrix forces you to ask two separate questions — ‘Is it important?’ and ‘Is it urgent?’ — rather than just one: ‘What’s the emergency?’.

For work, this means one simple thing: emails, messenger notifications and ‘urgent’ requests always have a short window of opportunity, which is why they constantly win the battle for attention. Reports, training or CV updates do not have such a window, and without a separate solution, they lose out. The matrix is that separate solution.

The four quadrants and what to do in each

The quadrants are described according to a methodological convention used by HappyMonday, Worksection, SendPulse and other blogs. This is not a strict rule, but an agreement, so the names of the actions may vary slightly across different sources.

QuadrantImportance / UrgencyActionWhat falls into this category at work
IImportant and urgentDo it yourself nowA task with a deadline today, on which the outcome depends; a failure that halts the team’s work
IIImportant, not urgentPlan (date and time in the calendar)Planning, training, skills development, problem prevention, updating your CV
IIINot important, urgentDelegate or reply brieflySome emails and calls, minor requests from colleagues that someone else can handle
IVNot important, not urgentDeleteAimless scrolling through feeds, habits that do not lead to goals

Quadrant I: Do

Tasks that have both consequences and a short deadline. You carry these out yourself and immediately. A sign of a task in this quadrant: if you put it off until tomorrow, the outcome for which you are responsible will suffer.

Work through Quadrant I without switching tasks: finish one task before moving on to the next. If there are several tasks here, compare them in terms of their consequences and start with the one where the consequences are greater.

Tip: If this quadrant is overflowing every day, that’s a warning sign. Some tasks were not planned in good time, and they have ‘grown’ into a crisis. This is not remedied by working faster, but by focusing on Quadrant II.

Quadrant II: Plan

Important tasks without a deadline. Stephen Covey considered this to be the most important: it includes planning, development and preventative measures, which, without a clear deadline, get put off indefinitely. HappyMonday also calls this the most important section of the matrix.

Action means not ‘I’ll do it sometime’, but a specific slot in the calendar with a date and time. The brain continues to perceive a task without a date as non-urgent, so it loses out to every new request. Break large tasks down into steps so that each step fits into a single scheduled block.

  • For employees: learning a new tool, preparing for a promotion discussion, sorting out processes that regularly go wrong.

  • For job seekers: updating your CV, expanding your network within the industry, preparing for interviews.

Quadrant III: Delegate

Tasks that are urgent but not important to your goals. This is where the ‘mere urgency’ effect most often kicks in: a request ‘for yesterday’ seems like a priority.

Hand the task over to someone for whom it is their main job, or deal with it with minimal effort. When delegating, state the expected outcome and deadline straight away; otherwise, the task will come back to you. If there is no one to delegate to, minimise the time spent: a short reply instead of a lengthy one, a written summary instead of attending a long meeting.

Check for Quadrant III: Will anything change in your overall results if someone else does this task? If not — it’s not yours.

Quadrant IV: delete

No consequences, no deadline. Such tasks are removed from the list, not postponed. The order of processing is a matter of methodological choice: HappyMonday advises starting with this quadrant, whilst other sources recommend starting with the ‘Do’ quadrant.

How to set priorities: questions for each task

The hardest part of the matrix is answering two questions honestly. Sources agree that importance refers to the impact on outcomes and objectives, whilst urgency refers to a short deadline. To ensure your answer isn’t influenced by your mood, turn these definitions into specific check questions.

Questions about importance

  • Does this task bring me closer to my goal for this week, this quarter or my job search?

  • What will happen if I don’t do it at all? If nothing — the task isn’t important.

  • Does the outcome for which I am personally responsible depend on it?

Questions about urgency

  • Is there a deadline beyond which the task will lose its meaning or the consequences will increase?

  • Who set this deadline — the circumstances, or simply someone’s desire to get an answer sooner?

  • Can it be done tomorrow without any loss? If so, the task is not urgent.

The second question about urgency is the most useful. Research into the mere urgency effect shows that even perceived urgency causes people to choose the worse option. A deadline that nobody has justified is a reason to review the matter once more, rather than abandoning everything.

When the answers are ambiguous, gauge importance against a specific goal set in advance. Without a clearly defined goal, whatever is asked for most loudly seems important.

How to build a matrix step by step

  1. List all your tasks. Work tasks, phone calls, emails, personal commitments — all in one list, without sorting.

  2. Ask yourself two questions about each task:

    • ‘Does this affect my goals or the outcome?’ (importance)

    • ‘Is there a short timeframe after which the task will lose its meaning?’ (urgency)

    • The answer must be clear: only ‘yes’ or ‘no’.

  3. Sort them into quadrants:

    • Two ‘yes’ answers → Quadrant I

    • ‘Yes’ (important) / ‘No’ (not urgent) → Quadrant II

    • ‘No’ (not important) / ‘Yes’ (urgent) → Quadrant III

    • Two ‘no’ answers → Quadrant IV

  4. Assign an action: for I — do today; for II — add to the calendar with a date; for III — decide who to pass it on to; for IV — cross it off.

  5. Visualise it. A sheet of paper divided into four parts, or a table in a word processor. Review it daily: tasks tend to move between quadrants.

Research does not specify how many tasks to place in each quadrant. The HappyMonday blog advises keeping no more than eight tasks in each block. If a quadrant has become too full, break large tasks down into smaller steps.

What a completed matrix reveals

Organised tasks aren’t just a plan for the day, but also a way of assessing how you allocate your time. See which quadrant dominates and draw your conclusions:

  • An overloaded Quadrant I: Important tasks reach you only when they’ve become ‘urgent’.

    • What to change: Schedule Quadrant II tasks into your calendar every week, before they become urgent.

  • Empty Quadrant II: Development, planning and prevention have no place in your schedule.

    • What to change: Find at least one important task without a deadline and assign it a specific date.

  • Large Quadrant III: Other people’s requests take up time because they seem urgent.

    • What to change: Delegate, reply briefly, and agree clearly on realistic deadlines.

  • Large Quadrant IV: A significant amount of time is spent on tasks with no consequences.

    • What to change: Decisively cross them off the list, rather than putting them off until tomorrow.

  • Almost everything is in Quadrant I: The ‘urgent = important’ assessment applies (the mere-urgency effect).

    • What to change: Assess each task by asking about its real consequences and deadlines.

Review this regularly. If the same quadrant dominates week after week, the problem lies not with individual tasks but with the system for accepting them. For example, a large Quadrant III often means that you’re agreeing to requests without asking about the deadline or the end result.

The matrix for the team and for yourself

The method works equally well for your personal to-do list and for the team, but with different emphases:

  • For yourself the key is Quadrant II: no one but you will put this in your calendar.

  • For the team, the key is Quadrant III: the manager decides who will handle urgent tasks that are not key to them.

When sorting through tasks together, agree on the criteria by which you’ll measure their importance. Without a shared goal, everyone will assess tasks subjectively. A written team objective for the week or quarter resolves most disputes.

When delegating, pass on not just the task, but also its quadrant. Someone who has been given a task marked ‘urgent but not critical’ will spend a reasonable minimum of time on it, rather than their entire working day.

Table template to copy

Copy this text template into your notes or a document and fill it in with your own tasks:
I. Important and urgent — DO TODAY:
— …
II. Important, not urgent — PLAN (specify date and time):
— …
III. Not important, urgent — DELEGATE (specify the person responsible):
— …
IV. Not important, not urgent — DELETE:
— …

Where to keep the matrix: on paper, in a spreadsheet, or in a task manager

There are three main methods, which differ only in terms of convenience:

  1. Paper: a sheet divided into four sections. Quick, but tasks have to be rewritten by hand when their status changes.

  2. Spreadsheet: four blocks or a ‘quadrant’ column next to each task. Convenient for sorting and moving items.

  3. Task manager: four columns on a Kanban board or four corresponding labels for tasks.

Tip: Colour-coding helps you assess the distribution at a glance. Assign a colour to each quadrant and stick to it. Also, set a limit on the number of tasks per quadrant: if a column exceeds the limit, this is a signal to break the tasks down into smaller steps or review your estimates.

How to apply this to your working day

Break down a typical day using the matrix. Typical examples are given below (the same task may fall into different quadrants for different people, depending on their role):

TaskQuadrantAction
A report or project with a deadline todayIComplete first, without switching tasks
Learning a new tool for workIIBook a time slot in the calendar for the week
Preparing for the annual appraisal or promotion discussionIISchedule a date and gather the results in advance
A colleague’s request to forward a file that they can find themselvesIIIProvide a link to the folder or pass it on to the person in charge
A meeting where your personal attendance isn’t requiredIIIAsk for a written summary
Checking your email every 15 minutes unnecessarilyIVTurn off notifications; read your emails during scheduled time slots

Sort through your emails at the start of the day, before opening your email or messaging apps, otherwise your agenda will be dictated by whoever wrote to you first.

The Eisenhower Matrix for job hunting

Job hunting is a project with its own deadlines and priorities. Below is an example of how to organise typical tasks:

TaskQuadrantAction
Test task with a deadline tomorrowIComplete today, postpone the rest
Reply to the recruiter regarding the interview timeIReply immediately
Update CV for a new sectorIISet aside a specific evening
Networking with people in your sector (networking)IISet aside a regular slot in your calendar
Prepare answers to common interview questionsIIPlan ahead before you’re invited
Sending a template response to all job vacancies in a rowIIIReplace them with tailored applications for selected vacancies
Endlessly refreshing the job feed without any applicationsIVSet up filters and view the selection once a day

It is Quadrant II that tends to be put off the most. CVs are often updated ‘when a job vacancy’, whilst networking is done ‘when needed’. Put these tasks in your calendar before they become urgent.

A week of job hunting using the matrix

  • Start of the week (Quadrant II): Make a list of job-hunting tasks, organise them by quadrant, and schedule Quadrant II tasks in your calendar.

  • Daily, one session (Quadrant II): Review a selection of vacancies using filters, and shortlist those that match your goals.

  • Every day, straight away (Quadrant I): Reply to recruiters, confirm interviews, and complete any test assignments with imminent deadlines.

  • Midweek (Quadrant II): Tailor your CV and cover letter to the selected vacancies, and send applications.

  • End of the week (Quadrants II & IV): Write to industry experts, prepare for interviews next week. Carry over unfinished tasks; cross out repetitive tasks from Quadrant IV.

Where the matrix came from: what Eisenhower actually said

Dwight D. Eisenhower — the 34th President of the United States (in office 1953–1961; 14 October 1890 – 28 March 1969).

He uttered the phrase with which the matrix is associated on 19 August 1954 in Evanston (Illinois) at the Second Assembly of the World Council of Churches. The transcript is preserved in The American Presidency Project. Verbatim:

‘This President said, “I have two kinds of problems, the urgent and the important. The urgent are not important, and the important are never urgent.”

These words do not originate from Eisenhower himself — in his speech, he was paraphrasing the view of a former college president, without naming him. Popular formulations (‘what is important is rarely urgent...’) are paraphrases. In the transcript, the idea is more categorical: what is urgent is not important, and what is important is never urgent.

Eisenhower did not draw the 2×2 matrix. As Quote Investigator notes: “He spoke a version of the adage, but he did not claim credit for it”. The name ‘Eisenhower Matrix’ appeared later. The model was popularised by Stephen Covey in his book *The 7 Habits of Highly Effective People* (1989), where he described it as a time-management matrix with a focus on Quadrant II.

Practical conclusion: The value of the method does not depend on who devised it. The matrix works because it distinguishes between two concepts that people tend to confuse, and this has been confirmed by scientific experiments conducted in 2018.

Advantages and disadvantages of the method

Advantages

  • Two questions instead of one: clearly distinguishes between ‘is it important?’ and ‘is it urgent?’.

  • A ready-made rule of action: for each quadrant, the decision is already known (do it, schedule it, delegate it, discard it).

  • Visible Quadrant II: important tasks without a deadline are assigned a specific time and date in the calendar.

  • Permission to say no: quadrants III and IV clearly indicate that some tasks do not need to be done by the person themselves or do not need to be done at all.

  • Versatility: suitable for paper, spreadsheets or apps; equally effective for work and personal purposes.

Drawbacks and common mistakes

  • Subjectivity of assessment: what one person considers important, another may regard as secondary (you need to focus on clearly defined goals).

  • Lack of resource accounting: the matrix does not show the complexity of tasks or the level of energy required to complete them.

  • The need for monitoring: organising tasks does not necessarily mean they will be completed (it must be combined with a calendar).

  • Dynamism: a task postponed from Quadrant II eventually becomes urgent and moves to Quadrant I, so the matrix should be updated regularly.

Looking for a job right now?
Browse jobs
logo
For candidates
For employers
Sign in
If you don't have an account, one will be created when you log in for the first time.
Sign in with popular services:
Or use email and verification code:
Just one step to your dream job!
Log in to the system and get full access to the functionality. Fill in your personal and company information after logging in.
helpNeed help?
logo
Sign in
If you don't have an account, one will be created when you log in for the first time.
Sign in with popular services:
Or use email and verification code:
Log in and let's continue!
This feature requires authorisation. It's fast!
helpNeed help?
Injobe logo